Office Building Jacarandas Lot 29

office-building-lote-29-jacarandas-6476-3

Tyson Office Building Jacarandas

Calle Flor de Pitaya, Cabo San Lucas, Los Cabos, Baja California Sur, México. Lote 29 – Fused lots 29 and 30. Commercial office building for sale. This is the introduction page showing the general structure and location of this property

IMG_6373-building-jacarandas-2
IMG_6373-building-jacarandas-2 – 24 April 2018
building-jacarandas-24-april-2018-6476-2
building-jacarandas-24-april-2018-6476-2
building-jacarandas-24-april-2018-6467-2
building-jacarandas-24-april-2018-6467-2
building-jacarandas-24-april-2018-6474-2
building-jacarandas-24-april-2018-6474-2

 

Jacarandas Building – Page One – General Structure Views
www.tysonjacarandas.com/building-jacarandas-lot-29/

Page  Two – Building Detail Images
www.tysonjacarandas.com/interior-details-office/

Page Three – Interior Details. Calle Flor de Pitaya, Mza &, Lote 29, Office space, offices, open areas.   www.tysonjacarandas.com/interior-details-office/

Page Four – Level Three Details
www.tysonjacarandas.com/level-three-flor-de-pitaya-lote-29/  

Page Five – Floor Plans – Original Drawings
www.tysonjacarandas.com/floor-plans-original/

Page Six – Aerial Drone Photos 
www.tysonjacarandas.com/aerial-drone-photos/

Floor Plans Original

Floor Plans from the Original drawings

 


Jacarandas Building – Page One – General Structure Views
www.tysonjacarandas.com/2018/05/11/building-jacarandas-lot-29/

Page  Two – Building Detail Images
www.tysonjacarandas.com/2018/05/10/interior-details-office/

Page Three – Interior Details. Calle Flor de Pitaya, Mza &, Lote 29, Office space, offices, open areas.   www.tysonjacarandas.com/2018/05/10/interior-details-office/

Page Four – Level Three Details
www.tysonjacarandas.com/2018/05/12/level-three-flor-de-pitaya-lote-29/

Page Five – Floor Plans – Original Drawings
www.tysonjacarandas.com/2018/05/12/floor-plans-original/

Page Six – Aerial Drone Photos 
www.tysonjacarandas.com/2018/05/10/aerial-drone-photos/

Interior Details Office

Interior Details – Office Building Jacarandas

Page Three – Calle Flor de Pitaya, Mza &, Lote 29, Office space, offices, open areas.

large-sales-office-jacarandas-6547
large-sales-office-jacarandas-6547 – Level 2 – View from entry side of room

 

large-office-area-level-2-2
large-office-area-level-2-2 -Nikon

 

large-sales-office-from-back-of-office-6546-2
large-sales-office-from-back-of-office-6546-2  Level 2

 

large-office-side-entrance-level-2-1611-2
large-office-side-entrance-level-2-1611-2 – taken from main office hallway

 

large-office-level-two-6520-2
large-office-level-two-6520-2 – currently used for design

 

level-two-entrance-reception-1615-3
level-two-entrance-reception-1615-3

 

small-office-level-two-6545-2
small-office-level-two-6545-2

 

interior-large-office-front-1592-2
interior-large-office-front-1592-2

 

cisterna-pila-opening-floor-6550-2
cisterna-pila-opening-floor-6550-2 – approximately 15,000 liters,  located in the employee kitchen area.

 

Jacarandas Building – Page One – General Structure Views
www.tysonjacarandas.com/building-jacarandas-lot-29/

Page  Two – Building Detail Images
www.tysonjacarandas.com/interior-details-office/

Page Three – Interior Details. Calle Flor de Pitaya, Mza &, Lote 29, Office space, offices, open areas.   www.tysonjacarandas.com/interior-details-office/

Page Four – Level Three Details
www.tysonjacarandas.com/level-three-flor-de-pitaya-lote-29/  

Page Five – Floor Plans – Original Drawings
www.tysonjacarandas.com/floor-plans-original/

Page Six – Aerial Drone Photos 
www.tysonjacarandas.com/aerial-drone-photos/

Level Three Flor de Pitaya Lote 29

Page Four – Photos from the third level of this project.

Level Three Flor de Pitaya Lote 29

Building-specs-photos-floor-plan-04-2
Building-specs-photos-floor-plan-04-2

Note: the above level 3 floor plan ha been modified. A small bedroom and small bathroom with shower has been added.  There is also a small work area with a desk and crib next to the added bedroom.

 

level-3-extra-rooms-patio-1579-2
level-3-extra-rooms-patio-1579-2

 

level-3-unfinished-room-1580-2
level-3-unfinished-room-1580-2
kitchen-level-3-jacarandas-6565-2
kitchen-level-3-jacarandas-6565-2

 

level-three-kitchen-1625-2
level-three-kitchen-1625-2

 

living-area-jacarandas-level-3-6568-2
living-area-jacarandas-level-3-6568-2

 

level-3-large-open-area-1572-2
level-3-large-open-area-1572-2 – Nikon

 

living-area-level-3-jacarandas-1602-1
living-area-level-3-jacarandas-1602-1 – Nikon

 

large-open-room-6555-street-side-2
large-open-room-6555-street-side – Level 3

 

level-3-bedroom-with-closets-1636-2
level-3-bedroom-with-closets-1636-2

 

level-3-bedroom-with-closets-1635-3
level-3-bedroom-with-closets-1635-3

 

Jacarandas Building – Page One – General Structure Views
www.tysonjacarandas.com/building-jacarandas-lot-29/

Page  Two – Building Detail Images
www.tysonjacarandas.com/interior-details-office/

Page Three – Interior Details. Calle Flor de Pitaya, Mza &, Lote 29, Office space, offices, open areas.   www.tysonjacarandas.com/interior-details-office/

Page Four – Level Three Details
www.tysonjacarandas.com/level-three-flor-de-pitaya-lote-29/  

Page Five – Floor Plans – Original Drawings
www.tysonjacarandas.com/floor-plans-original/

Page Six – Aerial Drone Photos 
www.tysonjacarandas.com/aerial-drone-photos/

Pictures and History March 1998 to 2001

Pictures and History March 1998 to 2001

 

building-chain-link-fence-july-2001
building-chain-link-fence-july-2001

 

Two images below: Then and now photos showing the property in 1998 and approximately the same location May 2018.

15 July 2001 – This view shows the new chain link fence around the property.

15 July 2001 – This is another view of the new chain link fence around the property. I am hoping to start planting  shrubs, trees and other plants very soon.

15 July 2001 – Driveway and parking area.

01 May 2000 – No major changes in the building. The area around the office has started to build up as more houses are under construction.

building-tyson-jacarandas-14-dec-1999-2
building-tyson-jacarandas-14-dec-1999-2

14 December 1999 – We are getting better organized each day. The exterior still needs painting but will have to wait until after the first of the year.

01 December 1999 – We are now officially in the new building and out of our previous space. All of the phones lines now work.

26 November 1999 – We have now moved the office into the new building. Most of the interior work is now complete. Some of the phone lines work, but the main lines are still not working correctly. They all should be available within the next few days.

building-view-25-october-1998-x2
building-view-25-october-1998-x2

 

30 October 1998 – This is the view of the Pacific Ocean from the front of the roof level of the office building. This view looks just to the west of the old light house.

16 March 1999 – One of the upstairs patios faces the Pacific ocean.
15 February 1999 – The upstairs office / apartment area is now painted
01 February 1999 – Electricity is now connected to the building.
27 November 1998 – Plaster has now been applied to the north side of the building (back side from this viewpoint), the upstairs patios and half of the south side of the building.
18 November 1998 – The wood support structure for the roof has been removed.
12 November 1998 – Plaster has been applied to most of the north side of the
building (back side from this viewpoint) and some of the upstairs patios.

Aerial Drone Photos

Aerial Drone Photos of Lot 10 and 29 (fusion of lots 29 and 30) with the building situated on Calle Flor de Pitaya, Cabo San Lucas.

jacarandas-flor-pitaya-29-0071-2
jacarandas-flor-pitaya-29-0071-2

 

 

jacarandas-flor-pitaya-aerial-lote-29-0074-2.jpg
jacarandas-flor-pitaya-aerial-lote-29-0074-2.jpg

 

DroneAerial  images by Francisco Estrada, PhotoMexico.com
photomexico.photoshelter.com/index

 

Jacarandas Building – Page One – General Structure Views
www.tysonjacarandas.com/building-jacarandas-lot-29/

Page  Two – Building Detail Images
www.tysonjacarandas.com/interior-details-office/

Page Three – Interior Details. Calle Flor de Pitaya, Mza &, Lote 29, Office space, offices, open areas.   www.tysonjacarandas.com/interior-details-office/

Page Four – Level Three Details
www.tysonjacarandas.com/level-three-flor-de-pitaya-lote-29/  

Page Five – Floor Plans – Original Drawings
www.tysonjacarandas.com/floor-plans-original/

Page Six – Aerial Drone Photos 
www.tysonjacarandas.com/aerial-drone-photos/

 

Building Jacarandas Details

building-jacarandas-24-april-2018-6489-x3

Details and list of infrastructure items that are included with the Jacarandas  property.

Page Two Building Details

Jacarandas Building – Page One

building-generator-large-6523-2
building-generator-large-6523-2

Backup Generator – 15 KW power system. Eaton/Cutler-Hammer LP powered. 200 amp 12-240 volt automatic transfer system.

jacarandas-stationary-propane-tank-6529-2
jacarandas-stationary-propane-tank-6529-2
tinacos-pair-1100-litera-6528-2
tinacos-pair-1100-litera-6528-2
tinaco-1100-liters-6488-2
tinaco-1100-liters-6488-2
rooftop-jacarandas-tyson-nikon-1581-2
rooftop-jacarandas-tyson-nikon-1581-2

 

building-jacarandas-24-april-2018-6489-2
building-jacarandas-24-april-2018-6489-2

 

View from rear of building toward the street. building-jacarandas-24-april-2018-6490-2.jpg
View from rear of building toward Calle Flor de Pitahaya Street. building-jacarandas-24-april-2018-6490-2.jpg

 

air-conditioner-compressors-6532-2
air-conditioner-compressors-6532-2

From left: hot water heater, gas fired; top level balcony walkway

 

cisterna-pila-opening-floor-6550-2
cisterna-pila-opening-floor-6550-2

 

Jacarandas Building – Page One General Structure Views

Page  Two – Detail Images
www.joetyson.com/blog/building-jacarandas-details/

Page Four – Level Three Details
www.tysonjacarandas.com/2018/05/12/level-three-flor-de-pitaya-lote-29/

Construction March 1998 to 2001

New Office Construction March 1998 to 2001

Calle Flor de Pitaya, Jacarandas, Los Cabos, Pictures and History – Pictures showing progress of construction.

building-jacarandas-20-october-1998-2
building-jacarandas-20-october-1998-2

20 October 1998 – Construction continues on the upper apartment and office level.  The wood frame supports are complete for the styrofoam and concrete beam roof system.  The workers are installing the styrofoam panels which will be covered with a wire mesh and then covered with a layer of concrete.

building-30-oct-1998-garage-open-2
building-30-oct-1998-garage-open-2
building-14-sept-98-offic12
building-14-sept-98-offic12 – low res image

14 September 1998 – Construction continues on the upper apartment and office level. Tropical storm Isis blew down the upper walls. You will notice the pile of broken block on the right hand side of the picture. We are now back to the level at the top of the windows. Notice how green the area is after all the rains from TS Isis.

building-jacarandas-tyson-06-aug-98-pump-2
building-jacarandas-tyson-06-aug-98-pump-2

06 August 1998 – Concrete is pumped to the ceiling of the office. A cement truck at ground level below supplies concrete for a pump truck behind the building.

building Jacarandas 06-august-1998-2
building Jacarandas 06-august-1998-2

06 August 1998 – Concrete is pumped to the office floor.
This will be the floor of the upstairs office and patio areas.

http://www.tysonjacarandas.com/wp-content/uploads/2018/05/concrete-pumping-building-jacarandas-06aug98-2.jpg
http://www.tysonjacarandas.com/wp-content/uploads/2018/05/concrete-pumping-building-jacarandas-06aug98-2.jpg

06 August 1998 – Workers direct the flow of concrete as it is pumped from the cement trucks on ground level. It is then spread out evenly and vibrated into all crevices for a solid floor.

 

building-jacarandas-pacific-view-31june1998-2
building-jacarandas-pacific-view-31june1998-2

31 July 1998 – This is the view of the Pacific Ocean we will have from the front of the office building. This view looks just to the west of the old light house.

Construction March to July 1998

Office Construction history with images March 1998 to July 1998. Calle Flor de Pitaya, Jacarandas, Cabo San Lucas, Los Cabos.

view-31-July-1998-jacarandas-2
view-31-July-1998-jacarandas-2

31 July 1998 – This is the view of the Pacific Ocean we will have from the front of the office building. This view looks just to the west of the old light house.

construction-31-July-1998-jacarandas-2
construction-31-July-1998-jacarandas-2

31 July 1998 – The interior and exterior walls are now complete to the rough finish stage. The main office ceiling is being prepared for concrete, which will be poured in about a week.

31 July 1998 – The worker on the left rolls out wire mesh to go under the concrete slab. The workers on the right attaches the wire mesh to the steel reinforcing rods that will be in the floor and ceiling.

jacarandas-27-jun-1998-vw-2
jacarandas-27-jun-1998-vw-2

27 June 1998 – The interior and exterior walls are now up to the top of the door and window openings. The lot line goes to the right side edge of the small construction shack on the right.

27 June 1998 – Left photo. View from the southwest. / 09 June 1998 – Concrete is pumped to the office floor.

concrete-pump-jacarandas-09-jun-1998-2
concrete-pump-jacarandas-09-jun-1998-2

09 June 1998 – Workers direct the flow of concrete as it
is pumped from the cement trucks on ground level.

New Office Construction
Pictures and History March 1998 to 2001

August to October 20, 1998

New Office Construction
Pictures and History  August 98 to October 20, 1998

20 October 1998 – Construction continues on the upper apartment and office level.

The wood frame supports are complete for the styrofoam and concrete beam roof system. The workers are installing the styrofoam panels which will be covered with a wire mess and then covered with a layer of concrete.

14 September 1998 – Construction continues on the upper apartment and office level.


Tropical storm Isis blew down the upper walls. You will notice the pile of broken block on the right hand side of the picture. We are now back to the level at the top of the windows. Notice how green the area is after all the rains from Isis.